Short answer
A 20,000-tag PI Server build is sized by its ingest rate in events per second, not by tag count: divide each scan class's tags by its period and sum. AVEVA's tested-topology guidance selects Topology 2A up to 5,000 events per second and Topology 2B from 5,000 to 20,000; bring the rate, the tag split, client counts, retention and availability to the vendor's topology review.
On this page
- The load number is events per second, not tag count
- Working the ingest rate for 20,000 tags at 1 s, 10 s and 60 s scans
- A first-pass envelope for the four roles
- Share one box or split the roles
- What to take to the topology conversation
- Which role is short when the system slows down
- Prove the build before it takes load
- Questions asked
A 20,000-tag PI Server build is not sized by its tag count. The number that selects the hardware and the topology is the ingest rate in events per second — for each scan class, the tag count divided by the scan period, summed — together with client counts, retention and availability. For a system with five PI Vision and five DataLink clients, work that rate first, match it to the published topology bands, then take the inputs to your Account Manager or Customer Success Manager: the old sizing spreadsheet is deprecated, and the vendor now matches plans to pre-defined, thoroughly tested topologies. This article walks the rate calculation, gives a role-by-role envelope to check against, and ends with the verification plan.
The load number is events per second, not tag count #
A tag costs the server what it stores, not what it is named. Two systems with the same tag count can sit an order of magnitude apart in stored events, and AVEVA's guidance for the AF Server makes the same point for analytics: hardware sizing follows workload, not object count, because the two do not correlate.
The planning number is the ingest bound — for every scan class, tag count divided by scan period in seconds, summed over the classes. Exception and compression pull the stored rate below that bound, and event-driven sources push past it, so measure both ends once the system runs. The same tag-count-times-rate logic sizes any historian backend; the breakdown of how tag count and write rate drive historian database sizing applies word for word. What differs here is where the decision ends: not in a formula you own, but in a vendor-tested topology.
Working the ingest rate for 20,000 tags at 1 s, 10 s and 60 s scans #
The case is the 20,000-tag system. The split between scan classes below is an example — build yours from the interface list, one row per interface:
- 2,000 tags on a 1 s scan class
- 6,000 tags on a 10 s scan class
- 12,000 tags on a 60 s scan class
The rule in words: the ingest bound is each class's tag count divided by its scan period in seconds, and the classes sum. Event-driven tags add their trigger rate on top; exception and compression subtract from it.
- 2,000 / 1 s = 2,000 events per second
- 6,000 / 10 s = 600 events per second
- 12,000 / 60 s = 200 events per second
- Total: 2,000 + 600 + 200 = 2,800 events per second
The decision: AVEVA's topology documentation recommends Topology 2A for systems up to 5,000 events per second and Topology 2B for systems between 5,000 and 20,000 events per second, and the tested environments behind those bands are kept current, so work from the live documentation rather than a saved copy. At 2,800 events per second the example plan sits in the 2A band. The sensitivity matters more than the total: move the 6,000-tag class from the 10 s scan to the 1 s scan and that class alone rises from 600 to 6,000 events per second, the total becomes 8,200 events per second, and the decision flips to 2B. One scan-class change moved the topology — which is why the per-interface table, not the tag count, is the input the review needs.
A first-pass envelope for the four roles #
Engineers running builds at this scale commonly quote the envelope below. Treat it exactly as that — a first-pass envelope to check the topology review against, not a published specification. The vendor's own sizing recommendations for the PI Server live in the PI Server Installation and Upgrade Guide, and each interface's installation prerequisites require confirming that the operating system and hardware support the interface before it is placed on a node.
| Role | CPU | RAM | Disk | Network |
|---|---|---|---|---|
| PI Server, all-in-one box | 3 GHz, 16 cores | 32 GB | 2 TB | 1 or 10 GbE |
| Interface or Connector node | 2.2 GHz, 6 cores | 8 GB | 300 GB | 1 or 10 GbE |
| SQL Server | between the node and the server | between the node and the server | 1 TB is ample at this scale | 1 or 10 GbE |
| PI Vision server | 2.2 GHz, 8 cores | 32 GB | 300 GB | 1 or 10 GbE |
What moves the envelope: archive disk layout and RAID, redundancy, the retention period, and hypervisor overhead if the roles run as guests. Mark every row provisional until the tested topology comes back, and write the source of each figure into the design sheet.
Share one box or split the roles #
Both layouts run at this scale, and the envelope above fits the archive role on a single box. Splitting still wins on three mechanisms.
- A burst of PI Vision queries competes with archive writes for CPU and memory. When a display is slow while the trend behind it is current, the Vision host is the first suspect; separating it keeps a client burst from starving the write path.
- The interface or connector node is a store-and-forward box: it collects, buffers and forwards. Keeping it off the server means an interface restart or patch interrupts neither ingest storage nor client service. At the envelope above, that role is a box-class machine rather than a rack server — where it mounts in a cabinet, the fitting hardware class is an industrial mini PC.
- SQL Server's load sits between the interface node and the PI Server. Its placement follows licensing and administration policy, not load.
Then draw the network path for every arrow — source to interface node, node to server, Vision to server, DataLink to server — and confirm each hop lands on the link speed the plan assumes.
What to take to the topology conversation #
The former Hardware and PI System Sizing Recommendation Spreadsheet is deprecated. The working path is your Account Manager or Customer Success Manager, who match the plan to the closest of the pre-defined, thoroughly tested topologies; the answers you bring select the match. Bring:
- the tag count and its split by interface or connector
- the events-per-second figure from the worked example above, average and peak, with the per-interface table behind it
- client counts — five PI Vision and five DataLink — and whether they are concurrent
- the retention period and the archive growth it implies
- the availability requirement: single node or redundant
- whether SQL Server is an existing instance or a new build
- the virtualization plan, if the roles run as guests
The returned topology names a node for each role. Compare every node against the envelope table and record each difference with its reason.
Which role is short when the system slows down #
Trace the operator symptom to a node before touching hardware, and separate capacity from configuration: a tag fault (a bad value or wrong scan class) and a binding fault (a display or sheet pointing at the wrong tag or server) look like slow hardware and need none.
- Display loads slowly with current data: CPU and memory on the Vision host, running out under concurrent displays.
- DataLink refresh slow while Vision is fine: a large time-range pull loading the PI Server during the refresh.
- Trend gaps that backfill late: the interface node's buffer or the link to the server — a store-and-forward symptom, not a disk one.
- One tag flat or bad while its neighbors move: tag configuration or the source device.
- A tag missing in one display but trending in another: the display's binding.
Confirm with counters: capture Windows CPU, memory, disk queue and network counters on each node across a normal shift, then again at peak client load, and set the numbers against the envelope table.
Prove the build before it takes load #
- Start every interface and connector and let the system reach steady state.
- Compare the measured event rate at the server against the per-interface table; investigate any interface running well above or below its estimate.
- Open displays from all five PI Vision clients and refresh all five DataLink sheets at once; record page-load and refresh times.
- Watch CPU, memory, disk queue and network counters on the PI Server, the Vision host and the interface node during step 3; sustained saturation on any node marks the short role.
- Drop the interface node's link to the server, wait, restore it, and confirm the buffered data backfills without gaps — run this in a window where losing buffered data is acceptable.
- Record archive growth over a week and check that the server disk covers the retention period; the measured-growth arithmetic behind estimating historian disk space from measured daily growth is the right tool.
The decision, end to end: compute the rate per interface and sum it; at the example's 2,800 events per second the tested-topology bands keep the plan in Topology 2A, and past that band's edge they move it to 2B; split the Vision host and the interface node off the archive server unless the topology review says otherwise; hold every envelope figure provisional until the tested topology comes back; and prove the build with every Vision and DataLink client loading it at once.
Questions asked
Why is tag count alone not enough to size a PI Server?
Load follows stored events, not names in the tag database. The rate is each tag divided by its scan period, summed over classes, and two systems with the same tag count can sit an order of magnitude apart. A 20,000-tag system scanned at 60 s stores roughly 333 events per second, while the same count at 1 s stores 20,000. Work the rate first, then select the topology.
What replaced the hardware sizing spreadsheet?
The spreadsheet is deprecated. The vendor path is your Account Manager or Customer Success Manager, who match the plan to the closest of a set of pre-defined, thoroughly tested PI System topologies. Bring the events-per-second estimate with its peak, the tag split by interface, client counts and concurrency, the retention period, the availability requirement, and whether SQL Server is existing or new.
What moves the stored event rate away from the tag-and-period bound?
Exception and compression suppress unchanged and flat values, so the stored rate lands below the bound. Event-driven interfaces push above it: event frames, machine events and batch step changes store when they trigger, not on a scan period. Treat the computed bound as the planning ceiling, then compare it against the measured rate on the running server during a normal shift and at peak.
Does virtualization change the PI Server sizing?
Virtualization changes the sizing only through the hypervisor's overhead and contention. The vendor's virtualization guidance carries PI Server-specific sizing recommendations alongside the installation guidance, so size a virtual host for the sum of the roles plus that overhead, then confirm the placement in the topology review.