Explainer
Why historian export between projects loses properties
Short answer
Exporting historian configuration between projects answers only one of three requirements. A cross-project integration structure exposes another project's archives for viewing without moving anything; a documented migration path transfers configuration ownership; stored records travel only if the platform's migration scope includes them. Decide which of the three you need, then verify the result against a baseline query on a known tag and interval.
On this page
- Access, ownership and records are three separate requirements
- What a cross-project integration structure actually does
- Why a working live value proves nothing about the history
- The properties that must stay attached to each historical variable
- The check on a 10 minute interval with 10 second logging
- When the originating project must be retired, use a documented migration path
- The decision for each case
- Questions asked
No, not by default. Exporting historian configuration from one project and importing it into another moves what the export function defines, and only that. Three different requirements hide behind the question: seeing another project's history, owning its configuration, and carrying its stored records across. Each has its own mechanism, and a screen that shows old trends proves neither of the other two. Decide which requirement you need before opening an export dialog, then verify the result against a baseline you recorded before the change.
Access, ownership and records are three separate requirements #
The question "can I export the historian into another project without losing properties" bundles three objectives that different mechanisms satisfy:
| Requirement | Mechanism that satisfies it | What proves it worked |
|---|---|---|
| Shared viewing of existing trends | Cross-project access through an integration structure | The destination screen resolves the originating project's archive and shows samples |
| Ownership of the historical configuration | A documented migration or transfer path | The destination holds and maintains the variables; the source can be retired |
| Transfer of stored records | A migration whose documented scope includes archives and samples | A query on the destination returns the known samples for a known interval |
Shared viewing copies nothing. Migration moves configuration and, only if its scope says so, records. A successful export alone satisfies the middle row at best; the bottom row needs its own verification regardless of how the configuration travelled.
What a cross-project integration structure actually does #
Placing both projects as members of an integration project lets consumers reference the originating project's variables and archives in place. Nothing is copied, so no property can be lost, because there is only one configuration and it never moves. The trade-offs are deliberate:
- The originating project and its archive service must stay in service for the history to resolve. If that project is retired, the displays break.
- Permissions, project context and the archive selection must be configured on the consuming side, or the operator selects a valid variable against the wrong archive.
- The reference must be made through the platform's supported cross-project mechanism, not by retyping a path that looks similar.
Check the capability first. If the installed platform cannot expose archives across projects, stop this approach there and use its documented transfer facilities instead of constructing references the runtime cannot resolve. An export in that situation does not become the answer; it becomes a different project, which is what the next section covers.
Why a working live value proves nothing about the history #
A live value and a historical display follow different paths. The live value travels from the controller through a communications driver to the tag. The historical display queries recorded samples through an archive service and a historical variable reference. Successful live communication proves neither that the archive collected samples nor that the destination screen is bound to the right archive.
The binding itself is a separate failure point. Some platforms let a historical display resolve its tag paths through indirection, so after a project move the display can still point at the originating project's paths even though it renders without errors. And what a screen shows is not what storage holds: what a trend export exposes depends on what the chart actually plotted, which is why an export from an Ignition Easy Chart shows the plotted series, not the archive contents. Read the configured object references on both sides; never rely on matching screen labels.
The properties that must stay attached to each historical variable #
Build the inventory before changing either project, using the configuration fields the installed software actually exposes, because property names and export coverage vary by platform. For each historical variable, record:
- Variable identity and archive membership, so queries cannot resolve to the wrong variable or fail to resolve.
- Driver and controller mapping, so new samples carry the right process value.
- Acquisition mode and logging conditions, including the logging trigger and any deadband, because sampling behavior can differ even when the displayed value looks correct.
- Scaling, engineering units and data type, because an unscaled integer reads as a plausible but wrong value.
- Retention and storage destination, because historical coverage follows the archive configuration, not the variable.
- Time interpretation and access permissions, because samples can land outside the selected interval or stay invisible to the operator.
Record two things separately: the variable properties, and the stored-data coverage. Preserving every property proves nothing about whether earlier samples came along, which is the check the worked example below performs.
The check on a 10 minute interval with 10 second logging #
This is an illustrative baseline check; the tag name and interval are examples you replace with your own before migrating.
Inputs. An example level tag TIC_101 in the originating project, configured to store one sample every 10 seconds, with no compression or change-only trigger altering the count. The baseline interval is 10 minutes, taken from a period when the tag was known to be collecting. Both values come from the source project's historian configuration, read before any export.
Rule in words. When a historian stores one sample per logging period, the expected sample count in an interval is the interval length divided by the logging period. If the logging trigger differs, the expected count changes with it, so the source configuration sets the expectation, not a rule of thumb.
Arithmetic. The interval is 10 minutes, which is 10 min × 60 s/min = 600 s. At one stored sample every 10 seconds, the expected count is 600 s ÷ 10 s/sample = 60 samples.
Result. The baseline query on the originating project returns 60 stored samples for that tag and interval, which confirms the source was collecting as configured. Write down the tag, the interval, the units and that count before touching anything else.
Decision. After the import, run the same query on the destination. If it returns the baseline count of 60, the records travelled with the configuration. If it returns zero, the configuration moved but the stored records did not, and you need a record migration path, not a re-export. A partial count means the retention window, compression settings or logging trigger differ between the two sides; compare those properties against the inventory before concluding that data was lost.
When the originating project must be retired, use a documented migration path #
Retirement means the destination must own the configuration and reach the required records on its own. Treat it as three checks even when the software presents one workflow: configuration export, dependency resolution, and historical-record migration. Scope the export to the product and version actually installed. AVEVA Historian, for example, documents a standalone utility named aahHistorianDump.exe for exporting and importing historian configuration; other platforms name their own equivalents differently, so read what your version documents and what scope it claims, then check what a historian migration moves and what you must rebuild on the destination.
Where only a subset of tags must move between live systems, a targeted transfer path is usually cheaper than a whole-archive migration; the way Canary Historian tag subsets are sent to another historian is one documented pattern, and product-specific routes for PI, Wonderware and Geo SCADA exist on this site for the platforms they name.
Back up both project configurations and the archive storage with the platform's documented backup procedure before changing project relationships, because a failed import with no backup is not recoverable.
Import into a test copy of the destination first, compare archive membership and every inventoried property against the baseline, and re-point imported communications references to the intended controllers before the destination collects anything.
The decision for each case #
- Operators need to see the old trends while both projects run: build the cross-project access structure and do not export. Accept the runtime dependency: the originating project and its archive service stay in service for as long as the history is needed.
- The originating project is being replaced or retired: use the platform's documented migration path for your product and version, re-point the imported references, then run the baseline record check. Shared access alone fails this objective, because the destination still depends on a project you intend to remove.
- The import completed but properties are missing: rebuild the missing properties from the pre-migration inventory on the test copy. Do not assume a re-export repairs a partial import; find which property groups the export scope omits and enter those by hand before the destination goes live.
Questions asked
If the tag names match on both sides, is the history guaranteed to be the same variable?
No. An identical display name proves nothing about identity. An imported object can keep an unresolved reference, and a locally created variable can carry the same name while mapping to a different controller point. Read the configured object reference, its project context and its archive membership on the destination side rather than trusting the label on the screen.
Does a vendor export utility also move the stored records?
Not necessarily. Several platforms ship a standalone utility that exports and imports historian configuration only, so the variables arrive with their properties but the archive storage stays behind. Read the documented scope for your product and version before you rely on it, and confirm the outcome with a baseline query rather than assuming the samples followed the configuration.
When should the originating project be shut down after a migration?
Only after the destination passes an isolated verification against the baseline: the same tag, the same interval, the expected sample count and the expected units and scaling. Until that check passes, keep the originating project and its archive service running as the fallback. Once the check passes, decommission it so collection does not continue on two systems.
Can two projects both collect the same tag after an import?
Yes, and it is a common result of a partial migration. Double collection doubles storage consumption and can present two slightly different values for one process point, depending on when each system last sampled it. Decide which project owns collection, enable the acquisition settings on that side only, and leave the other side reading rather than logging.